Firstly, our technicians dismounted, hauled away and recycled old insulation. In addition they installed a new HVAC 926TB60100V21 according to the building standards so that HVAC-system installation consists of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set. During this project we installed: