Firstly, our technicians dismounted, hauled away and recycled old insulation. In addition they installed a new HVAC 987MB66100C21 according to the building standards so that HVAC-system installation consists of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set.
During this project we installed:
Furnace - Bryant 987MB66100C21 Evolution 98 Variable-Speed Modulating Gas Furnace;