Firstly, our technicians dismounted, hauled away and recycled old insulation. Then they installed a new HVAC 801SA36070E147 according to the building standards. So that HVAC-system installation consists of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set. During this project we installed:
FURNACE - Bryant 801SA36070E14 LegacyTM 80 Line Fixed-Speeds 80% Efficiency Gas Furnace;
A/C CONDENSERS - Bryant 105ANA030000 A/C CONDENSERS (LEGACY Up to 16 SEER PURON A/C) 2,5 TON;