Firstly, our technicians dismounted, hauled away and recycled old insulation. Then they replaced the ductwork. In addition they installed a new HVAC 926TB48080V17 according to the building standard. So that HVAC system installation consist of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set. During this project we installed:
Gas Furnace - Bryant 926TB48080V17 Preferred 96 Two Stage Gas Furnace;